Corten steel solar canopy with timber decking on T-Block ground screws, in a park overlooking Mediterranean scrub.

Renewable energy · Carports and canopies

Carports and canopies

Covering parking spaces and rest areas without concrete foundations, with or without solar panels on top.

In a car park the paving is already laid, and that is where concrete gets expensive: break up, dig, pour, wait, make good. T-Block® ground screws go into the yard and carry the structure from below.

Three scales, three kinds of client

A home parking space and a municipal car park don't have the same client or the same constraints. The foundation, however, is the same.

Steel carport on a private garden paved with interlocking blocks: the foot of the structure sits directly on the paving, with no footing, and is fixed to the ground with T-Block screws.
T4 — T6

At home

Covered parking space, lean-to, garden canopy

The courtyard or driveway is already paved. The screw goes into the yard without lifting the paving blocks or redoing the sub-base: drill, screw in, assemble. At end of life it is unscrewed and the yard goes back to how it was.

Steel carport frame being assembled over an existing paved yard, with a car parked alongside: work proceeds row by row without closing the car park.
T6 — T7

At work

Staff parking, parking areas, EV charging

The car park stays in use during the works: you proceed row by row, without a site across the whole area, without concrete mixers and without curing times. Each point is independent of the others.

Corten steel canopy with a solar roof and timber decking, installed in a public park for resting and charging bicycles.
T6 — T10

In public space

Municipal car parks, parks, bike charging, rest areas

Removable, reversible works: when the concession or the service life ends, the area goes back to its original state without demolition and without disposing of concrete.

How it is installed

The yard is already there. It stays.

On an existing car park, a concrete footing means breaking the paving, digging, pouring, waiting for it to cure and then rebuilding the base. With a ground screw you drill one hole, screw in the anchor, and the paving around it stays in place.

Worker screwing a T-Block ground screw through the interlocking block paving of a courtyard with a hand-held power driver.

1 · Screwed into the yard

A hole in the paving and the screw goes in, with light equipment. No concrete mixer on site.

Close-up of the hex head of a T-Block ground screw seated in the hole drilled in the paving, with the surrounding blocks intact.

2 · The paving stays

The hole is local: the surrounding blocks are not lifted and there is no sub-base to rebuild.

Finished solar carport in a paved courtyard.

3 · Assemble and use

No curing time: the structure is mounted on the ground anchors and the parking space is available again.

Why it pays off in a car park

The yard is not broken up

This is the difference that matters in a car park: the paving is already there. A concrete footing means breaking it up, digging, pouring and then making good. A ground screw needs one hole and nothing else.

The car park stays open

No large site area, no truck mixers, no twenty-eight days of curing. You work row by row and hand the spaces back as you go.

Levelling on the nuts

Yards have drainage falls. The height of each ground anchor is adjusted during assembly without redoing the base: the structure stays level even on ground that isn't.

Genuinely removable

At end of life it is unscrewed and taken away. No buried concrete block to break out and dispose of, no sub-base to reinstate.

With panels, or without

A canopy is useful even when it doesn't produce energy: shade in summer, shelter from hail, protection for the bodywork, a covered charging point.

The foundation is the same in both cases. If you only want a cover today, you can add solar later without redoing the ground anchors: they are sized once and the structure stays ready.

For public covers the same principle applies to bicycle charging shelters and equipped rest areas.

Inside a corten steel solar canopy with timber decking and seating, in a public park.
Rest and charging canopies in a public park: solar roof, timber decking, screw anchors.

How many ground screws does your car park need?

For a canopy, the real question is how many ground anchors you need and whether the ground can carry them. Send us the plan of the area, the number of spaces and the type of structure: we reply with the anchoring layout and a clear quote.