Ground-mounted solar in the countryside: steel frames on T-Block ground screws in the grass, the first panels fitted and hills behind.

Renewable energy · Solar

Ground-mounted solar

First of all, canopies, carports and car parks. Then residential ground-mounted solar, where anyone with a little land has no reason to climb onto the roof for a small system.

Manual installation for residential systems, mechanised for large plants. Faster, safer and quieter sites. Full removal at the end of use: no demolition, no remediation, nothing left in the ground.

The leading application

Canopies, carports and car parks

It is the most requested area of ground-mounted solar, and the one where a screw foundation makes the clearest difference: in a car park the paving is already there. A concrete footing means breaking it up, digging, pouring and making good; a ground screw needs one hole and nothing else.

It applies to the home parking space, the company car park and the public one, and also to anyone who wants the canopy without panels for now, adding the solar system later on the same ground anchors.

Go to Carports and canopies

Why ground screws for solar

Fast, mechanised installation

The screws are driven with a hydraulic drive head or an electric power driver. No waiting for concrete to cure: the structure can be mounted the next day.

No concrete, no digging

No slab, no footings, no concrete pour. The ground stays intact under the panels and between the rows: less earthmoving, fewer heavy vehicles on site.

Removable when the concession ends

On farmland or leased land, at the end of the system’s life the screws are unscrewed and taken away, leaving no trace: no demolition, and they can be reused on another site.

Suited to mixed soils

The T-Block series cover loose, clay, gravel, sloping, frost-prone and seismic ground. Sizing is calculated on the real soil parameters to the Italian NTC 2018 code.

Recommended T-Block classes for solar

An overview of the families most requested for solar. For detailed sizing, use the configurator.

Class
T5
Round flange Ø140

For light and light-to-medium structures, fixed or on single-axis trackers. Ø48 shaft with 6 helix turns and a Ø140 mm round flange with 6 slots for direct fixing of the structure; also available with a hex head.

Length: 896 — 1,033 mm
Class
T6
Hex head

Longer than the T5, for higher loads or where the surface bearing capacity of the soil is low. Hex head (46, 60 or 70 across flats) with M12 or M16 threaded connection, in galvanized steel or AISI 304 stainless steel.

Length: 1,189 — 1,260 mm
Class
T7 — T10
Large installations

Larger structural tube section, up to 2 m long. Also available in AISI 304 stainless steel for aggressive environments. Designed for the loads of large solar plants and dual-axis trackers.

Length: 1,380 — 2,000 mm

Lengths are nominal, with a tolerance of ±1 cm.

Country houses, farm stays, historic residences

If you have the land, you don't need the roof

For a system of a few tens of kW on a farmhouse, a farm stay or a historic residence, the choice between roof and ground is not forced: anyone with space around the house can put the panels on the ground. And it almost always pays off.

In these buildings the roof is the most delicate and most expensive part to redo: old clay tiles, timber structures, irregular pitches, limited load capacity. Drilling it to fix brackets creates leak points in a roof that was never designed for them.

Close-up of the flange head of a T-Block ground screw carrying the inclined beam of a solar mounting structure, the lawn around it untouched.
The bearing point: the beam of the structure is bolted onto the head of the ground anchor, flush with the lawn.

No holes in the roof

No through-brackets, no leak points, no conflict with the roof covering warranty. The roof can be redone without dismantling the system.

Maintenance on the ground, not at height

Cleaning the modules, inspections, replacements, snow: all done on foot. No fall-arrest lines, no scaffolding or platforms, no work on the roof. It is the biggest difference in safety and in long-term cost.

Orientation by choice, not by chance

On the ground, orientation and tilt are decided at the design stage instead of accepting those of the roof pitch. The system can even be placed where it cannot be seen from the building.

Light-touch and reversible

No concrete footings in the ground: the screws are unscrewed and the lawn goes back to being a lawn. On a listed or valuable property it is removable works, not a permanent change.*

Residential ground-mounted solar on sloping woodland: rows of panels on rails carried by T-Block ground screws.
Residential ground-mounted system on a slope. Each ground anchor is screwed to the depth needed to take up the difference in level: no terracing, no retaining walls.

How it is built, in three steps

No digging, no concrete pour, no curing time: between the untouched lawn and the panels producing power there are just three assembly stages.

T-Block ground screws installed and aligned in the grass of a field, before the solar mounting structure is fitted.
1 · The foundationsThe screws are driven in line, to the design level. The lawn around them stays as it was: no access tracks, no spoil heaps.
Workers assembling the steel frames of a solar mounting structure on T-Block ground screws in a country field.
2 · The structureThe frames are bolted directly onto the flange head. Assembly can start the same day: there is no concrete to wait for.
Rows of solar modules on a steel structure anchored with T-Block ground screws on farmland.
3 · The modulesAt the end of the system's life everything is dismantled and the screws are unscrewed: the land can be farmed again with no demolition and no remediation.

* How the works are classified for planning purposes, and any landscape protection constraints, depend on local regulations and on the project: always check with your designer, the local authority and, for protected buildings, the heritage authority.

MV/LV substations · Power stations · Plant rooms

Substations without a concrete slab

Every solar plant connected at medium voltage needs a transformer substation or a power station. The usual practice is to set it on a concrete slab: excavation, reinforcement, pour, curing, and permanent works in the ground, with the planning procedure that goes with them. With T-Block the prefabricated substation sits and is bolted on a steel frame anchored to the ground with screw foundations: installation is finished in a day, and at end of life everything is unscrewed.

No slab, no digging

The screws are driven, the frame is bolted, the substation is fixed on top. No pour, no curing time: the base is ready the same day, even in winter or bad weather.

Removable, reversible works

No permanent masonry in the ground: when the concession ends the substation is lifted off, the screws are unscrewed and the land goes back to how it was. Compared with a slab, the absence of permanent works can simplify the permitting process*.

Precise levelling

The base is levelled by adjusting the screws, even on ground that is not perfectly flat. The substation stays raised off the ground: ventilated, protected from standing water, with inspectable cable routes.

Recommended series: T7 — T15

The anchor points (typically 4 to 12, depending on the weight and geometry of the substation) are sized on the real geotechnical parameters of the site to the Italian NTC 2018 code. Send us the datasheet and weight of the substation: we reply with the anchoring layout and a clear quote.

* How the works are classified for planning purposes depends on local regulations and on the project: check with your designer and the local authority.

Ground screws vs driven posts vs concrete

A qualitative comparison for solar. Real figures depend on the specific project: use the configurator for an estimate on your case.

Criterion T-Block ground screws Driven posts Concrete footing
Typical installation time per anchor 3 — 5 min 3 — 5 min pour + up to 28 days of curing
Excavation needed none none yes, possibly with reinforcement
Removable at end of life yes (unscrewed, leaves no trace) partly (extraction damages the ground) no (demolition + disposal)
Compatibility with farmland very good fair poor
Reuse on another site yes limited no
Embodied CO₂ (order of magnitude) low (steel + galvanizing only) medium high

Frequently asked questions

Do you need concrete footings or pours for a ground-mounted solar system?
No. T-Block ground screws are screwed into the ground and the structure is bolted directly to the flange head: no slab, no footings, no pouring. There is no concrete to wait for, so the structure can be mounted straight away.
What happens to the foundations at the end of the system's life?
The structure is dismantled and the screws are unscrewed: they are taken away and leave no trace, with no demolition or remediation, and the land can be farmed again. The screws can be reused on another site. On farmland or leased land, this is the removability the contract requires at the end of the concession.
Can they be used on sloping ground?
Yes. Each anchor is screwed to the depth needed to make up the difference in level: no terracing, no retaining walls.
How do you choose the T-Block model for a solar system?
It depends on the structure, the load and the soil. Detailed sizing is done with the configurator, on the real soil parameters and to the Italian NTC 2018 code; on this page you will find the most requested series.
Can transformer cabins be anchored too?
Yes. The prefabricated cabin rests on and is bolted to a steel frame anchored to the ground with ground screws: no slab, installation is completed in a day and at end of life everything is unscrewed. The anchor points, usually from 4 to 12, are sized on the weight and geometry of the cabin.

More answers on service life, soils and permits in the FAQ.

Something that needs saying

We haven't changed our minds.
Solar has changed.

We supplied foundations for ground-mounted solar early on. In 2009 our screws carried a plant of around 6 MW at Montalto di Castro, built in ninety days without a single concrete pour.

Then we stopped. Not because we didn't believe in solar, but because we didn't agree with taking land away from farming just to produce energy. We left that segment despite the know-how we had built up, and that decision cost us.

Today things are different. Agrivoltaics makes it possible to produce energy and keep farming or grazing the same land. So we decided to put that knowledge back to work, for agrivoltaic design.

The structure can change. The land must remain land.

Ready to design your solar plant?

Send us the type of system, its output, the soil and your schedule: we reply with the right T-Block class and a clear quote.