The constraint: two places that cannot be touched
The cloister of the Statale and a resort garden share the same problem for different reasons: in the first the ground is protected, in the second it is the client's calling card. In both cases a concrete footing means digging, a mixer, curing time and, at the end, demolition and reinstatement.
Then there is the calendar: a design installation opens on a fixed date and closes on a fixed date. The setting time of concrete does not fit into that calendar.